Product Inquiry Form
×

Aluminum wave board-aluminum extrusion profile for curtain wall with silver anodize

  • Condensation Prevention: Limits temperature differentials across the structure, reducing the risk of condensation buildup inside the wall system.
  • Impact Resistance: The plastic boot absorbs vibrations and shocks during installation or building movement, protecting the aluminum angle from deformation or surface damage.
  • UV and Weather Resistance: High-quality plastics (e.g., PVC or nylon) resist degradation from sunlight, extreme temperatures, and weathering.
  • Alignment and Fit: The plastic sleeve ensures precise alignment during assembly, reducing installation errors.
  • Friction Reduction: Acts as a lubricant, allowing smoother adjustments when connecting panels or framing components.
  • Scratch Prevention: Protects the aluminum’s anodized or powder-coated finish during handling and installation.
  • Hidden Connections: Plastic boots allow for cleaner, seamless joints in the curtain wall, maintaining the system’s visual uniformity.
  • Color Customization: Plastic sleeves can be manufactured in colors matching the aluminum or curtain wall design, enhancing architectural aesthetics.
  • Lightweight Design: Aluminum’s low weight combined with plastic components reduces transportation and labor costs compared to bulkier alternatives.

Product Details

Use:Curtain wall part

Material:Aluminum alloy 6063-T6 per AA standard, other aluminum alloy is also available

Dimension:250x40x3000mm

Weight:around 3200g/pc

Processing:Alloy melting-Extruding-cutting- anodizing – inspection and packing

OEM/ODM:per customer’s requirements. We can develop new products together.

Surface Treatment:Sand blasting and satin anodize or black anodize or painting or powder coating (UV proof and bear 500hours salt spray test) are also for selection

Packaging:Each pc in polybag (one end sealed),foam sheet separates each pc, 10pcs/ carton, then packed with pallet, customized packing is also available

Production Leading Time: For items per customer’s specification, mold developing and sample confirmation is 12-15 days, production leading time is 15-20 days after sample confirmed.

MOQ:1000pcs

Supply Ability:300000 pcs per Month
Payment Terms:30% deposit before production, the balance paid before loading.

Port: Shenzhen or Guangzhou.

Place of Origin:China, Guangdong

Certifications:ISO9001, ISO14001, ISO45001, RCV, and GRS

  • Peter Bali
  • Lewis Yu