Product Inquiry Form
×

Aluminum hinge with Stainless steel axis and trembled surface assembled for skylight

  • Pre-Drilled Holes and assembled stainless steel axis:ease of Installation: Pre-drilled holes ensure accurate alignment during assembly,
  • Black Anodized Surface Finish:Provides a sleek, uniform matte or semi-gloss black appearance, ideal for modern architectural designs.Corrosion Resistance: The anodizing process creates a hard, oxide layer that protects against moisture, UV radiation, and environmental pollutants.Anodized finishes are chemically bonded to the aluminum, ensuring long-term color retention without fading, peeling, or chipping (unlike painted finishes).
  • Lightweight Strength:Aluminum extrusions offer high strength-to-weight ratios, minimizing structural
  • Fire Resistance:Aluminum is non-combustible (Class A fire rating), meeting stringent building safety standards.
  • Recyclability:Aluminum is 100% recyclable, and anodizing is an eco-friendly process (no VOC emissions).
  • Low Maintenance:The durable anodized surface requires minimal cleaning and no repainting, reducing lifecycle costs.
  • Compliance & Standards:Meets international standards for curtain wall systems (e.g., ASTM, EN,Reach).

Product Details

Use:High-rise commercial buildings seeking a modern, monolithic appearance. Or projects in coastal or urban areas requiring corrosion resistance.

Material:Aluminum alloy 6063-T6 per AA standard, other aluminum alloy is also available

Dimension:around 300g/pc

Weight:300x70x10mm or optional

Processing:Alloy melting-Extruding-cutting- machining-deburr -assemble- inspection and packing

OEM/ODM:per customer’s requirements. We can develop new products together.

Surface Treatment:Sand blasting and satin anodize or black anodize or painting or powder coating (UV proof and bear 500hours salt spray test) are also for selection
Packaging:Each pc in polybag (one end sealed),foam sheet separates each pc, 10pcs/ carton, then packed with pallet, customized packing is also available

Production Leading Time: For items per customer’s specification, mold developing and sample confirmation is 12-15 days, production leading time is 15-20 days after sample confirmed.

MOQ:3000pcs

Supply Ability:300000 pcs per Month
Payment Terms:30% deposit before production, the balance paid before loading.

Port: Shenzhen or Guangzhou.

Place of Origin:China, Guangdong

Certifications:ISO9001, ISO14001, ISO45001, RCV, and GRS

  • Peter Bali
  • Lewis Yu